Real-Time Construction Tracking

Up-to-date awareness about project performance, is the main need of investors, clients, and managers. So, on-line quantitative and qualitative tracking of project status is an essential process. Now, ISIX real-time construction tracking system, which provides online construction information is accessible. Hence, Supervisors, QC personnel and construction workers can use their portable tablets for tracking construction status at the moment. Therefore, one can register required information on related elements of the 3D-BIM model in a categorized manner on specified fields. Integrated structure of ISIX system and its monitoring modules, facilitates project’s tracking, and provides real-time data for comprehensive project management.

ISIX provides tools for specifying quantitative and qualitative status of project activities. So, one can use portable tablets to register construction activity’s status on the 3D-BIM model. Furthermore, ISIX provides the possibility to use this feature in an offline and online mode. Therefore, Supervisors, QC personnel and construction-workers can easily register construction data one project unique data-base, only with a few clicks. As a result, construction information such as start/finish date, progress, quality, documents, pictures, and any other data, is accessible. ISIX structure makes registration of project data in a classified manner, mandatory. This leads classified and categorized usage of analyzed and refined project data.

Real-Time Monitoring of Project Status
Diagnose Risks
Taking Obstacles into Accounts, Reducing Delays

The most important factor behind delays and claims in construction time, is executive obstacles and conflicts such as Overlaps in contractor’s common work domains or field hurdles. So, solving these issues can reduce claims and save time for successful project delivery. Fortunately, ISIX structured and systematic tools and features make it possible to resolve problems in a short time. Online Registrations of obstacles in categorized format and real-time proceeding work flows are some of these ISIX features. Now, project managers can be quickly aware about status of different project sectors. And consequently, they can be timely remove hurdles, and prevent delays.

Diagnose Risks
Risk Elimination by Supervisory Checklists

ISIX pre-defined and/or configurable supervisory checklists facilitate qualitative project control. In addition, ISIX supervision system reduces technical risks by timely recognizing faults. Here, ISIX makes it possible carrying out reformations in effective time. As a result, different executive, supervisory, quality control teams and managers can effectively eliminate project risks by timely decision makings. Furthermore, ISIX provides platforms for classified registration of construction information in checklists. In conclusion, one can easily carry the project supervisory and/or quality control predefined work flows, which facilitate control and confirmation process.

Auto Generation of Daily/Weekly/Monthly Reports

ISIX online digital registration of activities’ status, paves the way for access to project construction data in any given time. In addition, ISIX automatically classifies information based on the project WBS and predefined categories. Therefore, it makes effective utilization of data for efficient management possible. Furthermore, easy access to registered project data, makes automatic report generation feasible. Hence, managers’ assistants can easily prepare various daily, weekly, monthly reports.

Real-Time Monitoring of Project Status